Why Power Design Switched from PlanGrid to Fieldwire
Get the full story
Learn why Power Design, #16 on ENR's ranking of the top electrical contractors in the US, switched 1.4 billion dollars in projects off PlanGrid and onto Fieldwire.
fieldwire.com | support@fieldwire.com | +1 855-222-4959
Why Power Design switched from PlanGrid to Fieldwire
Learn why Power Design, #16 on ENR's ranking of the top electrical contractors in the US, switched 1.4 billion dollars in projects off PlanGrid and onto Fieldwire.
In this story, you'll find:
● Why Power Design chose Fieldwire over PlanGrid
● How the IT team switched over 227 projects with a half-million plans with zero downtime
● How team leaders organized the rollout to maximize adoption
Fieldwire powers the top general contractors, owners, and subcontractors.
Download the case study to find out why.
Download the case study to find out why.
Brad Moore, VDC Technology Manager at Power Design
Brad Moore, VDC Technology Manager at Power Design